Concrete plant

First 0% clinker concrete plant

Designed and built with respect for our environment, this ultra-modern plant enables our R&D team to carry out a large number of tests at the Bournezeau site (85).
With a capacity of 50 m³/h, this plant is capable of producing concrete using all our technologies. All the concrete components used in the plant are made from our H-UKR cement. The process water treatment has been developed so that it can be used for its own consumption. A major innovation that extends our disruptive industrial adventure in the service of more responsible construction.

Technologies at the cutting edge of innovation

The treatment of process water has been developed to enable self-consumption. A major innovation that extends our disruptive industrial adventure in the service of more responsible construction.